數(shù)控鋼筋籠滾焊機(jī)的保養(yǎng)方式
來(lái)源:http://niuniury.com/ 發(fā)布時(shí)間:2023-12-23 瀏覽次數(shù):0
數(shù)控鋼筋籠滾焊機(jī)每天開機(jī)之前,要對(duì)機(jī)子進(jìn)行的檢查,主要檢查的內(nèi)容如下:
Before starting up the CNC steel cage rolling welding machine every day, a comprehensive inspection should be conducted on the machine. The main inspection contents are as follows:
(1)要檢查急停按鈕(三個(gè)中的任意一個(gè))是否處于按下狀態(tài)C控制電源開關(guān)是否處于關(guān)閉狀態(tài);
(1) Check whether the emergency stop button (any one of the three) is in the pressed state, and whether the control power switch is in the off state;
(2)各條線路連接是否為正常狀態(tài);
(2) Whether the connections of each line are in a normal state;
(3)要仔細(xì)檢查是否存在漏油情況;
(3) Carefully check for oil leakage;
(4)各螺栓螺帽有無(wú)松動(dòng)情況;
(4) Check for any looseness in the bolts and nuts;
(5)電氣柜內(nèi)粉塵是否過(guò)多。
(5) Is there too much dust inside the electrical cabinet.
數(shù)控鋼筋籠滾焊機(jī)在運(yùn)行過(guò)程中,要注意檢查馬達(dá)是否有過(guò)熱現(xiàn)象。
During the operation of the CNC steel cage rolling welding machine, attention should be paid to checking whether the motor is overheated.
數(shù)控鋼筋籠滾焊機(jī)運(yùn)行過(guò)程中,嚴(yán)禁對(duì)電氣部分進(jìn)行遮蓋,要保持散熱順暢。
During the operation of the CNC steel cage rolling welding machine, it is strictly prohibited to cover the electrical parts and ensure smooth heat dissipation.
設(shè)備運(yùn)行2個(gè)月左右后,要對(duì)斷路器馬達(dá)接線端子電箱內(nèi)接線端子,在電源切斷的情況下進(jìn)行重新緊固。
After about 2 months of operation, the circuit breaker motor wiring terminals inside the electrical box should be re tightened with the power cut off.
2個(gè)月左右要對(duì)減速機(jī)液壓站油量進(jìn)行定期檢查。若不足,需要進(jìn)行添加,如有漏油現(xiàn)象要進(jìn)行及時(shí)進(jìn)行修理。
Regular inspection of the oil level at the hydraulic station of the reducer should be carried out around 2 months. If it is insufficient, it needs to be added. If there is any oil leakage, it should be repaired in a timely manner.
每個(gè)星期要對(duì)所有的潤(rùn)滑油嘴進(jìn)行打黃油一次。
Apply butter to all lubrication fittings once a week.
設(shè)備正常運(yùn)行2個(gè)月左右,要對(duì)所有的螺栓螺帽進(jìn)行重新緊固。
The equipment has been running normally for about 2 months, and all bolts and nuts need to be re tightened.
每周要定期用油漆毛刷或微風(fēng)吹風(fēng)機(jī)電氣柜中的灰塵,保持電氣柜內(nèi)清潔,否則可能會(huì)引起短路燒壞設(shè)備的事故發(fā)生。
Regularly clean the dust in the electrical cabinet with a paint brush or a breeze blower every week, and keep the cabinet clean. Otherwise, it may cause accidents such as short circuits and equipment damage.
對(duì)配套設(shè)備,如液壓站的維護(hù)保養(yǎng)請(qǐng)參閱相應(yīng)產(chǎn)品使用說(shuō)明書(嚴(yán)防進(jìn)水拆卸相應(yīng)零部件嚴(yán)防灰塵和其他臟物進(jìn)入)。
For the maintenance and upkeep of supporting equipment, such as hydraulic stations, please refer to the corresponding product user manual (strictly prevent water ingress, disassembly of corresponding components, and entry of dust and other dirt).
上一篇:式焊接專機(jī)與傳統(tǒng)焊接設(shè)備有什么區(qū)別?
下一篇:等離子氬弧自動(dòng)焊機(jī)的使用特性