日本一卡二卡四卡无卡乱码视频免费,国产女人aaa级久久久级,亚洲国产在一区二区三区,性色av免费网站

泰安揚(yáng)帆數(shù)控科技有限公司為您提供等相關(guān)信息發(fā)布和資訊展示,敬請關(guān)注!
咨詢服務(wù)熱線:
13345281377

新聞資訊

產(chǎn)品

行業(yè)新聞

焊接專機(jī)出現(xiàn)問題后有哪些方法檢查?

來源:http://niuniury.com/  發(fā)布時(shí)間:2022-07-28 瀏覽次數(shù):0

焊接專機(jī)出現(xiàn)問題后有哪些方法檢查?在這里講一下對比、置換元器件、逐步開路(或接入)法,展開內(nèi)容分析一番吧。
What are the methods to check when there is a problem with the welding machine? Here we will talk about the methods of comparison, replacement of components and parts, and gradual open circuit (or access), and carry out the content analysis.
1)對比法
1) Contrast method
把檢測數(shù)據(jù)與圖樣資料及平時(shí)記錄的正常參數(shù)相比較來判斷故障。對于無資料又無平時(shí)記錄的焊接設(shè)備,可查閱相關(guān)手冊或者產(chǎn)品說明書,也可以與同型號的完好焊接設(shè)備相比較。
Compare the test data with the drawing data and the normal parameters recorded at ordinary times to judge the fault. For welding equipment without data or usual records, you can refer to the relevant manuals or product manuals, or compare it with the intact welding equipment of the same model.
電路中的焊接設(shè)備元件屬于同樣用途性質(zhì)或多個(gè)元件共同控制同一設(shè)備時(shí),可以利用其他相似的或同一電源的元件動作和數(shù)據(jù)情況來判斷故障。
When the welding equipment components in the circuit belong to the same purpose or multiple components jointly control the same equipment, the action and data of other similar components or components of the same power supply can be used to judge the fault.
2)置轉(zhuǎn)換元件法
2) Set conversion element method
為了保證焊接設(shè)備的利用率,某些電路的故障原因不易確定或檢查時(shí)間過長時(shí),利用相同焊接設(shè)備上可轉(zhuǎn)換的同一性能良好的元器件實(shí)驗(yàn),以證實(shí)故障是否由此電器在元器件引起。
In order to ensure the utilization rate of welding equipment, when the fault cause of some circuits is difficult to determine or the inspection time is too long, use the same components with good performance that can be converted on the same welding equipment to test to confirm whether the fault is caused by the electrical appliance in the components.
運(yùn)用轉(zhuǎn)換元件法檢查時(shí)應(yīng)注意,當(dāng)把原焊接設(shè)備拆下后,要認(rèn)真檢查是否已經(jīng)損壞,只有肯定是由于該焊接設(shè)備本身因素造成損壞時(shí),才能換上新焊接設(shè)備,這樣可以防止新?lián)Q元件再次損壞。
When using the conversion element method to check, it should be noted that when the original welding equipment is removed, it should be carefully checked whether it has been damaged. Only when it is certain that the damage is caused by the welding equipment itself, can the new welding equipment be replaced, so as to prevent the new components from being damaged again.
3)逐步開路(或接入)法
3) Step by step open circuit (or access) method
山東焊接專機(jī)設(shè)備中多支路并聯(lián)且控制較復(fù)雜的電路短路或接地時(shí),一般有明顯的外部表現(xiàn),如冒煙、有燒焦痕跡等。電焊機(jī)內(nèi)部或帶有護(hù)罩的電路短路、接地時(shí),除熔斷器熔斷外,不易發(fā)現(xiàn)其他外部現(xiàn)象,這種情況可采用逐步開路(或接入)法檢查。
In Shandong special welding machine equipment, when multiple branches are connected in parallel and the circuit with complex control is short circuited or grounded, there are generally obvious external manifestations, such as smoking, burning traces, etc. When the circuit inside the welding machine or with shield is short circuited and grounded, it is not easy to find other external phenomena except the fuse is blown. This situation can be checked by the step-by-step open circuit (or access) method.
山東焊接專機(jī)
①逐步開路法
① Step by step open circuit method
遇到難以檢查的短路或接地故障,可重新更換熔斷器熔體,把多支路電路,一路路逐步或地從電路中斷開,然后通電試驗(yàn),若熔斷器一再熔斷,故障就在剛剛斷開的這條電路上。
In case of short circuit or grounding fault that is difficult to check, the fuse melt can be replaced again, the multi branch circuit can be disconnected from the circuit step by step or emphatically, and then the power on test. If the fuse blows repeatedly, the fault is on the circuit just disconnected.
然后再將這條支路分成幾段,逐段地接入電路。當(dāng)接入某段電路時(shí)熔斷器又熔斷,故障就在這段電路及某焊接設(shè)備元件上。這種方法簡單,但容易把損壞不嚴(yán)重的焊接設(shè)備元件徹底燒毀。
Then the branch is divided into several sections and connected to the circuit section by section. When a certain circuit is connected, the fuse blows again, and the fault lies in this circuit and some welding equipment components. This method is simple, but it is easy to completely burn the components of welding equipment that are not seriously damaged.
②逐步接入法
② Step by step access method
電路出現(xiàn)短路或接地故障時(shí),換上新熔斷器逐步或地將各支路一步一步地接入電源,重新試驗(yàn)。當(dāng)接到某段時(shí)熔斷器又熔斷,故障就在剛剛接入的這條電路及其所包該文章講述了焊接設(shè)備故障的檢查方法與維修經(jīng)驗(yàn).含的焊接設(shè)備上。
In case of short circuit or ground fault in the circuit, replace the new fuse, gradually or emphatically connect each branch to the power supply step by step, and retest. When receiving a certain section, the fuse blows again, and the fault lies in the circuit just connected and its package. This article describes the inspection methods and maintenance experience of welding equipment faults, including welding equipment.
在排除焊接設(shè)備故障時(shí),可用一根絕緣棒將有關(guān)繼焊接設(shè)備、接觸器以及電磁鐵等用外力強(qiáng)行按下,使其常開觸點(diǎn)閉合,然后觀察焊接設(shè)備部分或機(jī)械部分出現(xiàn)的各種現(xiàn)象,如電動機(jī)從不轉(zhuǎn)到轉(zhuǎn)動,設(shè)備相應(yīng)的部分從不動到正常運(yùn)行等。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://niuniury.com咨詢吧。
When troubleshooting the welding equipment, an insulating rod can be used to forcibly press the relevant relay welding equipment, contactors and electromagnets with external force to close their normally open contacts, and then observe various phenomena in the welding equipment or mechanical part, such as the motor never turns to rotate, and the corresponding part of the equipment never moves to normal operation, etc. Come to our website for more relevant content http://niuniury.com Consult.

上一篇:維修時(shí)應(yīng)詳細(xì)觀察焊接設(shè)備本身
下一篇:數(shù)控焊接時(shí)要提前知道什么事項(xiàng)

久久精品动漫一区二区三区| 国产精品免费AⅤ片在线观看| 美女又黄又免费的视频| 国产亚洲一区二区在线观看| 精品乱码一区二区三区四区| 欧美成人精品视频在线不卡| 欧美男生射精高潮视频网站| 丰满爆乳在线播放| 1卡2卡三卡4卡AⅤ乱码免费| 国产精品一卡二卡三卡| 亚洲av中文无码乱人伦app| 伊人久久精品无码二区麻豆| 黑人巨大精品欧美| 国产精品亚洲AV人片| 哒哒哒免费视频观看在线WWW| 成 人 色综合 综合网站| 黑人大群体交免费视频| 国产色精品VR一区二区| 2021国产精品国产精华| 成 人 黄 色 网 站 视频| 丰满少妇作爱视频免费观看| 永久免费无码日韩视频| 国产在线视频国产永久| 久久久久人妻一区精品| aⅴ精品无码无卡在线观看| 亚洲人成小说网站色在线| 久久久久成人片免费观看| 亚洲男人的天堂在线播放| 偷国产乱人伦偷精品视频| 久久老子午夜精品无码| 99久久精品国产免费看| 精品国产一区二区三区久久 | 护士奶头又白又大又好摸视频 | 在教室伦流澡到高潮H作文| 国产精品XXX大片免费观看| 亚洲精品无码高潮喷水a片软| 中文字幕久久熟女蜜桃| 国产成人无码精品久久久免费| 爱性久久久久久久久| 国产欧美日韩亚洲精品区| a级毛片毛片免费观看久|